미국대학원_과제_건설사의 애널리틱스, 빅데이터 사업적용에 대한 연구 제안서_Columbia Univ_Research Proposal
- 등록일 / 수정일
- 페이지 / 형식
- 자료평가
- 구매가격
- 2021.01.19 / 2021.01.19
- 3페이지 / docx (MS워드 2007이상)
- 평가한 분이 없습니다. (구매금액의 3%지급)
- 500원
최대 20페이지까지 미리보기 서비스를 제공합니다.
자료평가하면 구매금액의 3%지급!
1
2
3
추천 연관자료
- 미국대학원_과제_애널리틱스, 빅데이터 및 IoT 건설사 사업적용 제안서_Columbia Univ_Analytics_Proposal_IoT and Analytics in Construction
- 미국대학원_과제_애널리틱스, 빅데이터 및 IoT 건설사 사업적용 제안 발표자료_Columbia Univ_Proposal Pitch_IoT and Analytics in Construction
- 미국대학원_과제_애널리틱스, 빅데이터 모델_Columbia Univ_Analytical Model
- 미국대학원_과제_애널리틱스, 빅데이터와 협업_Columbia Univ_Team Resolving_Module 7
- 미국대학원_과제_애널리틱스, 빅데이터와 조직_미디어 산업_프레젠테이션 자료_Columbia Univ_Analytics in Organizations Presentation- Media
- 본문내용
-
RESEARCH PROPOSAL
Negotiation Improvement Proposal
Procurement Negotiation in ABC Construction Co.
Background
There are numerous kinds of equipment and materials to procure for an industrial construction project. Most of them do not have standard prices because their prices depend on the technical specifications requested by buyers. When a buyer places an order with a list of technical specifications to a seller and request him to manufacture a product that satisfies what is described in the specifications, such an order is called made-to-order. Since the prices and technical design for the same made-to-order item can vary depending on which supplier or seller a buyer purchases from, the purchasing procedure involves in the following: (1) the buyer sends out a request for quotation (RFQ), which describes the specific information for an item to purchase (such as name of the item, technical specification, delivery date, terms and conditions, etc) to several suppliers (usually six), (2) the buyer and an engineer check the suppliers quotations sent in response to the RFQs, which include their technical designs and prices, (3) the buyer reduces the list of the suppliers to include only the ones meet the technical needs and have competitive prices (usually three), (4) the buyer performs negotiation with each supplier individually to set the final terms and conditions, and price, and lastly, (5) the buyer make a contract with the supplier whose item meets the buyers expectation and has the lowest price.
Problem Statement
Procurement plays an important role in increasing the profitability of a construction project by reducing the costs of the equipment and materials for the project. The management wants to enhance the performance of procurement departments negotiation to further reduce the costs.
@*Note: When measuring the effectiveness of negotiation, we include financially measurable terms only.
Management-Research Question Hierarchy
Management Question
자료평가
-
아직 평가한 내용이 없습니다.
회원 추천자료
- 미국대학원_과제_4차 산업 혁명_애널리틱스, 빅데이터 3.0_Columbia Univ_Analytics 3.0 by Tom Davenport
- 미국대학원_과제_애널리틱스, 빅데이터 조직 형성 및 육성_Columbia Univ_Developing Analytics Team
- 미국대학원_과제_애널리틱스, 빅데이터 문화_Columbia Univ_Analytics Culture
- 미국대학원_과제_애널리틱스, 빅데이터 건설업 이용사례와 전략 및 분석_Columbia Univ_Analytics and Strategy in Construction
- 미국대학원_과제_애널리틱스, 빅데이터, 데이터과학 동기와 우선순위 및 주체성_Columbia Univ
오늘 본 자료
더보기
최근 판매 자료
- 나의 교직관 레포트
- 논설문쓰기지도(논설문지도)내용, 논설문쓰기지도(논설문지도)사례, 논설문쓰기지도(논설문지도)자료, 논설문쓰기지도(논설문지도) 관련 제언
- 갑신정변
- 만3세 부모상담일지 1학기 5명 (아주 자세합니다)
- 만3세 1년 3월-2월 부모상담일지 (아주 자세합니다)
- 만3세 1학기 부모상담일지 15명
- 의사소통영역 교수학습 지도안 읽기 말하기 듣기 상황 그림을 보고 어떤 일이 있었는지 추리하면서 자신의 생각을 말할 수 있다
- 유치원 원아 수업 지도안(의사소통영역)
- 한국의 텔레커뮤니케이션 발전역사와 사회에 미치는영향
- 일본의 역사 일본의 연호 일본 시대별 사건 요약 야마토 정권 일본의 역사 그리고
저작권 관련 사항 정보 및 게시물 내용의 진실성에 대하여 레포트샵은 보증하지 아니하며, 해당 정보 및 게시물의 저작권과 기타 법적 책임은 자료 등록자에게 있습니다. 위 정보 및 게시물 내용의 불법적 이용, 무단 전재·배포는 금지됩니다. 저작권침해, 명예훼손 등 분쟁요소 발견시 고객센터에 신고해 주시기 바랍니다.