[무역계약론] CISG Article. 60(매도인 인도수령의 의무)
- 등록일 / 수정일
- 페이지 / 형식
- 자료평가
- 구매가격
- 2011.02.25 / 2019.12.24
- 17페이지 / hwp (아래아한글2002)
- 평가한 분이 없습니다. (구매금액의 3%지급)
- 1,400원
최대 20페이지까지 미리보기 서비스를 제공합니다.
자료평가하면 구매금액의 3%지급!
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
추천 연관자료
- 목차
-
<목차 - Contents>
1. CISG Article 60의 내용
- 매수인의 인도수령의 의무
2. CISG Article 60 관련 Case
- Art. 60 case 원본
- Art. 60 case 요약본
- 양 당사자 측의 주장 및, 판결근거
- Case 관련 기타 CISG 관련 조항
:
3. 생각
- 본문내용
-
There is evidence that this factory was not complete and that it presented defects including the cover and presence of dust, filthiness, inclusive humidity -- all of which can damage delicate impression mechanisms. And [Seller] made a gigantic effort to document the factory's condition, essentially bringing to this process probatory material that had already been entered in the records of a related Court of First Instance proceeding (77/00 First Instance Court number 3 of Palencia) between [Buyer] and "Hormigones Sierra", the contractor that built the factory. However, even assuming that [Seller]'s allegations of improper development of the factory are as [Seller] has stated, it has not being demonstrated that this situation impacted equally on all the parts of the installation compound and, what is most important, from the expert opinions, the logical deduction is that:
- The situation referred to did not affect at all the fundamental fact of the impression machinery;
- That was not what caused the machinery to fail after the installation.
It is also surprising that none of the technicians that, by [Seller]´s orders, went to help with the installation and the running of the machinery stated anything about the factory conditions at that time -- without regard to what they declared later in these proceedings
In a similar vein, are the allegations that lack of stable electricity and water supply to feed the machinery in the [Buyer]´s factory made the proper functioning of the referred machinery impossible. It is far from certain that these factors affected the machinery.
The power supply. As to the electricity supply, it is true that when the machinery arrived, the factory had a lack of power supply -- because a high voltage line was pending. Accordingly, it was offered to make it function with an electric generator with a far more superior power than required. This, in the judgment of the expert and the manifestations of one of [Seller]'a witnesses,
자료평가
-
아직 평가한 내용이 없습니다.
오늘 본 자료
더보기
최근 판매 자료
- [마케팅성공사례] `(주)두산 처음처럼` 마케팅 분석
- 산업심리학_워크넷에서 성인용 직업적성검사를 시행하고 그 결과를 요약한 후, 제 3자인 기업체 인사담당자의 입장에서 본인과 직무배치 상담을 하는 가상적인 시나리오를 작성해보자
- KT&G의 마케팅 전략분석, 생산과 물류 체계 분석, 조직 인사의 특징 및 재무 상태 분석
- TQM(전사적품질관리)의 기본원리와 사례
- 활속의화장품과향수_친환경 화장품과 유기농 화장품의 현재 동향 및 발전 방향 (1)
- 삼일회계법인 인사관리 현황과 문제점 및 개선방안
- CLO의 코칭 레포트
- [호텔경영] 신라&메리어트 호텔의 조직 구성도
- [인적자원관리] 삼성전자의 인사관리와 개선방안
- 분석심리학의 창시자 융의 일대기 융 생애 융 일화 융 중요 이론 융 주요 이론 융 저서 융 영향 융 공헌 융 업적 융 소개 융 조사 융 분석 융 개요 융 고찰 융 소고 융 피피티 융 ppt
저작권 관련 사항 정보 및 게시물 내용의 진실성에 대하여 레포트샵은 보증하지 아니하며, 해당 정보 및 게시물의 저작권과 기타 법적 책임은 자료 등록자에게 있습니다. 위 정보 및 게시물 내용의 불법적 이용, 무단 전재·배포는 금지됩니다. 저작권침해, 명예훼손 등 분쟁요소 발견시 고객센터에 신고해 주시기 바랍니다.